Consult IT Request a quote

Home / Offices / Mali

Consult IT Mali.

Consult IT Mali

Mali at a glance

Regulator
AMRTP (Autorité Malienne de Régulation des Télécommunications, des TIC et des Postes)
Certificate lasts
5 years, renewable.
Renewal
File at least 4 months before expiry, with the first-application documents and no sample. The AMRTP reviews the test reports again.
Sample
One sample with all its accessories. An application with no sample after one month is refused.
Local holder
Yes. The application is filed by the manufacturer's agent established in Mali, under a direct letter of authorization.
Filing channel
By email, with a paper file: cover letter from the local holder and form signed by the manufacturer.
Regulator's time
About 2 weeks; at most 2 months from a complete file.
Marking
Not currently required.
Families & modules
One brand per certificate; no family approval.

What we do for you here

  • We take your file to the AMRTP in person — and stay on it until the certificate is issued.
  • Mali wants a local holder. Our company here is it.
  • Sample required: ship it DDP to our office yourself, or leave it to our staff or partner team in Mali — they bring it in and clear customs.
  • We track the expiry date and file the renewal in time.

What's different in Mali.

Renewal timing Renewed attestations are usually issued before the current one expires.

How a file runs at the AMRTP.

  1. File the application by email, with a paper file: cover letter, form signed by the manufacturer and technical documents.Local holder
  2. Send one sample with all its accessories. An application with no sample after one month is refused.Manufacturer · Within 1 month of filing
  3. The AMRTP reviews the file on the basis of an approval issued abroad and the test reports. Without a recognized foreign approval, the model is examined in an AMRTP-approved laboratory, at the applicant's expense.AMRTP
  4. Decision. Any refusal comes in writing, with reasons.AMRTP · About 2 weeks; at most 2 months from a complete file
  5. The AMRTP issues the attestation of conformity, valid for 5 years.AMRTP

What the AMRTP wants in the file.

First application

  • Application form Signed by the manufacturer
  • Letter of authorization Direct, from the manufacturer to the local holder
  • Cover letter to the AMRTP Prepared by the local holder
  • Declaration of conformity
  • Datasheet or technical specifications
  • User manual
  • Product photos
  • Approval or attestation of conformity issued abroad For the simplified procedure (Decree 2016-0274, art. 15)
  • Sample One, with all its accessories

Renewal

  • Application form Signed by the manufacturer
  • Letter of authorization From the manufacturer to the local holder
  • Cover letter to the AMRTP Prepared by the local holder
  • Commitment that the equipment still complies From the manufacturer or the holder
  • Declaration of conformity
  • Datasheet or technical specifications
  • User manual
  • Product photos
  • Test reports RF, EMC and safety; the AMRTP reviews them again
  • Proof of payment of the approval fees

Test reports the AMRTP reads.

  • RFAs cited on the declaration of conformity
  • EMCAs cited on the declaration of conformity
  • SafetyAs cited on the declaration of conformity
  • Health (RF exposure, SAR)Where the declaration of conformity cites it

Questions people ask about Mali.

Who issues type approval in Mali?

The AMRTP, Mali's regulator for telecom, ICT and postal services.

Which equipment needs approval?

Telecom and ICT equipment, terminals and radio installations, before marketing, import, holding or sale (Decree 2016-0274, art. 4). Temporary admission and imports for own use are exceptions.

How long is the certificate valid?

5 years, renewable.

When and how do we renew?

File at least 4 months before expiry, with the first-application documents and a commitment that the equipment still complies. No sample is needed; the AMRTP reviews the test reports again.

Is a sample required?

Yes, one sample with all its accessories. An application with no sample after one month is refused.

Do we need a local representative?

Yes. The manufacturer's agent established in Mali files the application, under a direct letter of authorization.

Which test reports are needed?

RF, EMC, electrical safety and health (RF exposure) reports, as cited on the declaration of conformity.

Are foreign approvals and laboratories accepted?

Yes. The simplified procedure relies on an approval or attestation issued abroad. Without one, the model is examined in an AMRTP-approved laboratory.

Can several brands or models share one certificate?

No. One certificate covers one brand, with no family approval.

What if we modify the product?

A change to the software, hardware, name or technical characteristics needs a new approval. Tell the AMRTP about planned changes; it decides whether a new assessment is needed.

Is labeling required?

Not currently.

How long does the AMRTP take?

About 2 weeks. The decree sets a maximum of 2 months from a complete file.

How is the application filed?

By email, with a paper file: a cover letter from the local holder and a form signed by the manufacturer.

Can we bring in units for a demo or a show?

Yes, under temporary admission: 3 months, renewable, with the notice "Équipement non agréé".

Can equipment be sold after the certificate expires?

No. Approval is required to import, hold for sale, sell, distribute or advertise, and equipment without a valid approval is seized.

After a change — and what is at stake.

After a change to the product

  • A change to the software, hardware, name or technical characteristics needs a new approval.
  • Tell the AMRTP about any planned change; it decides whether a new assessment is needed.
  • The AMRTP has accepted that a change of manufacturer name alone waits for the renewal.

Penalties named in the rules

  • Equipment marketed without a valid approval is seized.
  • Imprisonment, fines or both, for importing or exporting equipment without approval; penalties double for repeat offenses (Ordinance 2011-023, art. 86 and 88).
  • Suspension of the approval when the equipment no longer meets the essential requirements, with time to comply, then withdrawal.

Talk to the Mali office.

Consult IT Mali

GMT (UTC+0)

Quote from Mali

The regulator here

AMRTP (Autorité Malienne de Régulation des Télécommunications, des TIC et des Postes)