Burkina Faso at a glance
- Regulator
- ARCEP Burkina Faso (Autorité de Régulation des Communications Électroniques et des Postes)
- Certificate lasts
- Up to 5 years, renewable
- Renewal
- File before expiry: renewal letter, copy of the current certificate, no-change declaration and the first-application documents
- Sample
- Only on ARCEP request
- Local holder
- Required: an agent established in Burkina Faso, registered in a UEMOA trade register
- Filing channel
- By email: application letter from the local holder to the ARCEP
- Regulator's time
- 2 months from receipt of the application
- Marking
- Non-removable sticker with the approval number and year, before sale
- Families & modules
- No family approval. No modular approval: modules and end products are approved separately.
What we do for you here
- We take your file to the ARCEP in person — and stay on it until the certificate is issued.
- Burkina Faso wants a local holder. Our company here is it.
- Sample required: ship it DDP to our office yourself, or leave it to our staff or partner team in Burkina Faso — they bring it in and clear customs.
- Marking's required. We check your label artwork before it's printed.
- We track the expiry date and file the renewal in time.
What's different in Burkina Faso.
Who files The local holder fills out the ARCEP form and signs the application letter, for first applications and renewals.
How a file runs at the ARCEP.
- Prepare the file and fill out the ARCEP equipment form.Local holder
- Pay the approval fees and attach a copy of the receipt.Local holder · At filing
- Send the application letter and the file to the ARCEP by email.Local holder
- Type examination of the documents and laboratory reports. A sample is supplied only if the ARCEP asks.ARCEP
- Certificate issued, or a refusal with reasons.ARCEP · 2 months from receipt of the application
- Affix the non-removable sticker with the approval number and year before sale.Certificate holder · Before sale
What the ARCEP wants in the file.
First application
- Application letter to the President of the Authority Signed and sent by the local holder
- Letter appointing the local holder From the manufacturer; foreign manufacturers add an attestation of representation
- Applicant information sheet Local holder
- Equipment information sheet (ARCEP form) Filled out by the local holder
- Trade register of a UEMOA member state Local holder
- Proof of payment of the approval fees Copy of the receipt
- Declaration of conformity From the manufacturer
- Technical data sheet From the manufacturer
- General description identifying the product From the manufacturer
- Photos
- Design and manufacturing drawings From the manufacturer
4 more documents
- List and description of components, sub-assemblies and circuits From the manufacturer
- Operating instructions and user manual From the manufacturer
- Test reports See test reports
- 1 sample Only if the ARCEP asks; marked with brand, model, type, place of manufacture and module codes
Renewal
- Signed renewal letter Sent by the local holder
- Copy of the current certificate
- Declaration that the equipment is still manufactured and unchanged From the manufacturer
- Letter appointing the local holder From the manufacturer
- Declaration of conformity From the manufacturer
- Applicant information sheet Local holder
- Equipment information sheet (ARCEP form) Filled out by the local holder
- Technical data sheet From the manufacturer
- User manual From the manufacturer
- Photos
- Test reports See test reports
- Receipt for the fees
Test reports the ARCEP reads.
- RFFirst application and renewal; accredited laboratory
- EMCFirst application and renewal; accredited laboratory
- SafetyFirst application and renewal; accredited laboratory
What is paid — and when.
Named here, never priced. Your quote sets out every amount.
- Approval feesAt filing; a copy of the receipt goes in the file
- Renewal feesWith the renewal request; receipt attached
Questions people ask about Burkina Faso.
Who issues type approval in Burkina Faso?
The ARCEP, the electronic communications and postal regulator.
Which products need approval?
Any terminal meant for a public network, and any equipment using radio frequencies, connected or not.
How long is the certificate valid?
Up to 5 years, renewable.
How does renewal work?
File before expiry with a renewal letter, a copy of the current certificate, a no-change declaration and the first-application documents.
Is a sample required?
Only if the ARCEP asks for one.
Do we need a local holder?
Yes. The applicant must be established in Burkina Faso and registered in a UEMOA trade register. Foreign manufacturers provide an attestation of representation.
Which test reports are required?
RF, EMC and electrical safety reports from an accredited laboratory.
Can one certificate cover a family of models or a module?
No. Each model is approved on its own. Modules and end products are approved separately.
How long does approval take?
2 months from receipt of the application.
Is labeling required?
Yes. A non-removable sticker with the approval number and year goes on the equipment before sale.
How is the application filed?
By email. The local holder sends the application letter and the file to the ARCEP.
What if we modify the product?
Any change of software, hardware, name, brand, model or technical characteristics needs a new approval. A company name change without a brand change keeps the certificate.
What happens after the certificate expires?
Approval is the authorization to place the product on the market. After expiry without renewal, the ARCEP treats the certificate as no longer valid and a new certification is needed.
After a change — and what is at stake.
After a change to the product
- Any change of software, hardware, name, brand, model or technical characteristics requires a new approval.
- A change of standard not covered by the file means a new application, with file fees.
- A change of company name without a change of brand keeps the certificate.
Penalties named in the rules
- Imprisonment, a fine or both, for carrying out an activity that requires approval without it.
- A fine for a certificate holder supplying non-compliant equipment, and permanent withdrawal for a repeat offense.
- Disconnection and suspension of the approval if the equipment disturbs the network; renewal is refused if the equipment no longer complies.
Talk to the Burkina Faso office.
The regulator here
ARCEP Burkina Faso (Autorité de Régulation des Communications Électroniques et des Postes)

