Cameroon at a glance
- Regulator
- ART (Agence de Régulation des Télécommunications)
- Certificate lasts
- 3 years, renewable
- Renewal
- Same documents and procedure as a first application; whether samples are needed again is confirmed when the file is prepared. The ART takes about 3 months to process a renewal.
- Sample
- 3 samples per model, with all accessories
- Local holder
- Required: a local company with a trade register (RCCM), a taxpayer card and a tax clearance certificate
- Filing channel
- By email, through the local holder
- Regulator's time
- 90 days from filing; approval is deemed granted after that
- Families & modules
- No family approval. Finished products only; no modular approval.
- Language
- French or English
What we do for you here
- We take your file to the ART in person — and stay on it until the certificate is issued.
- Cameroon wants a local holder. Our company here is it.
- Sample required: ship it DDP to our office yourself, or leave it to our staff or partner team in Cameroon — they bring it in and clear customs.
- We track the expiry date and file the renewal in time.
What's different in Cameroon.
Who files The local holder fills out the ART form and signs the application letter.
License to sell Selling or installing the equipment also requires a seller or installer license.
How a file runs at the ART.
- The local holder fills out the ART application form and prepares the file.Local holder
- Pay the file review fee to the ART and keep the receipt for the file.Local holder · At filing
- The manufacturer checks and confirms the draft file. The draft is prepared by the local holder or issued by the ART.Manufacturer
- Send the application letter, the file and the 3 samples to the ART.Local holder
- Technical review. The ART may use an approved laboratory or ask for the equipment to be installed for testing.ART
- Decision. Without a decision in time, approval is deemed granted.ART · 90 days from filing
- The approval certificate is issued, valid for 3 years.ART
What the ART wants in the file.
First application
- Application letter to the ART Director General Prepared by the local holder
- ART application form Filled out by the local holder; radio sections for radio equipment
- Letter of authorization From the manufacturer, naming the local holder
- Declaration of conformity From the manufacturer; lists all standards used
- Technical data sheet From the manufacturer
- Technical description: field of use, electrical, mechanical and software specifications French or English
- User and operating manual French or English
- Block diagrams with explanatory notes From the manufacturer
- Electrical diagrams (wiring and network interface) From the manufacturer
- Test reports listed on the declaration of conformity See test reports
- Approval from the country of origin Or the manufacturer's declaration of conformity on the form
6 more documents
- Trade register (RCCM) certificate Certified copy; local holder
- Taxpayer card Certified copy; local holder
- Tax clearance certificate Local holder
- ART receipt for the file review fee Issued by the ART
- Draft file confirmed by the manufacturer Checked before the file is finalized
- 3 samples Per model, with all accessories
Renewal
- Declaration that the equipment and the first-application information are unchanged From the manufacturer or importer
- Application letter to the ART Prepared by the local holder
- ART application form Filled out by the local holder
- Letter of authorization From the manufacturer
- Declaration of conformity From the manufacturer
- Technical data sheet From the manufacturer
- User manual From the manufacturer
- Test reports See test reports
- Draft file confirmed by the manufacturer
- Other first-application documents (whether samples are needed again is confirmed when the file is prepared) Renewal follows the same rules as a first application
Test reports the ART reads.
- RFFirst application and renewal
- EMCFirst application and renewal
- SafetyFirst application and renewal
What is paid — and when.
Named here, never priced. Your quote sets out every amount.
- File study feeAt filing; the ART receipt goes in the file
Questions people ask about Cameroon.
Who issues type approval in Cameroon?
The ART, the telecom regulator under the MINPOSTEL ministry.
Which products need approval?
Terminal equipment meant to connect to a network, and radio installations, connected or not.
How long is the certificate valid?
3 years, renewable.
How does renewal work?
Renewal follows the same rules as a first application, with a declaration that nothing has changed. The ART takes about 3 months.
How many samples are needed?
3 samples per model, with all accessories.
Do we need a local holder?
Yes. The applicant is a local company with a trade register, a taxpayer card and a tax clearance certificate.
Which test reports are required?
RF, EMC and safety reports, as listed on the declaration of conformity.
Can one certificate cover a family of models or a module?
No. Each model is approved on its own, as a finished product.
Can one model carry several brands?
No. A model is approved under one brand only.
How long does approval take?
The ART has 90 days from filing. Without a decision in that time, approval is deemed granted.
How is the application filed?
By email. The local holder sends the application letter and the file to the ART.
Does the manufacturer check the file?
Yes. The manufacturer confirms a draft before the file is finalized.
Which language for the documents?
French or English.
What if we modify the product?
A change to the tested characteristics requires a renewal. Any change to the approved model needs the ART's prior approval.
Can stock be sold after the certificate expires?
No. The ART bans the use and operation of equipment whose approval has expired, and this covers stock.
After a change — and what is at stake.
After a change to the product
- Changing the tested technical characteristics requires a renewal of the approval.
- The approved model may not be modified without the ART's prior approval.
- A model is approved under one brand only.
- A change of manufacturer name is accepted without a new approval.
Penalties named in the rules
- Importing, manufacturing, holding for sale, distributing, connecting or advertising non-approved equipment is punishable by imprisonment, a fine or both.
- The ART bans the use and operation of equipment whose approval has expired.
- The ART can withdraw an approval if the holder breaches its conditions or if the equipment causes interference or a risk to health or the environment.
Talk to the Cameroon office.
The regulator here
ART (Agence de Régulation des Télécommunications)

